Southwest Research Institute

In 2014, Southwest Research Institute (SwRI) developed the first vehicle-to-grid aggregation system qualified by the Electric Reliability Council of Texas (ERCOT). The system allows for owners of electric delivery truck fleets to make money by assisting in managing the grid frequency. When the electric grid frequency drops below 60 Hertz, the system suspends vehicle charging which removes the load on the grid thus allowing the frequency to rise to a normal level. The system is the first of its kind because it operates autonomously.[37]

The system was originally developed as part of the Smart Power Infrastructure Demonstration for Energy Reliability and Security (SPIDERS) Phase II program, led by Burns and McDonnell Engineering Company, Inc. The goals of the SPIDERS program are to increase energy security in the event of power loss from a physical or cyber disruption, provide emergency power, and manage the grid more efficiently.[38] In November 2012, SwRI was awarded a $7 million contract from the U.S. Army Corps of Engineers to demonstrate the integration of vehicle-to-grid technologies as a source for emergency power at Fort Carson, Colorado.[39] In 2013, SwRI researchers tested five DC fast-charge stations at the army post. The system passed integration and acceptance testing in August 2013.[40]